S.NO. CLIENT DESCRIPTION STATUS
1 M/S Adani Wilmar Kakinada) Industrial Flooring Completed
2 M/S Mylan Laboratories Pvt Ltd (Jaggayapeta) Industrial Flooring Completed
3 M/S Mylan Laboratories Pvt Ltd (Jaggayapeta) Industrial Flooring Completed
4 M/S. Mylan Laboratories Pvt Ltd (Jeedimetla) Repair & Rehabilitation of RCC Structure Completed
5 M/S Vipassana Constructions Pvt Ltd (Jubilee Hills) Repair &Rehabilitation of RCC Structure Completed
6 M/S Tusker Pharma Pvt Ltd (Hyderabad) Repair &Rehabilitation of RCC Structure Completed
7 M/S Pennar Industries Ltd (Isnapur) PU Grouting Completed
8 Commercial Building (Vijayawada) Rehabilitation of RCC Structure Completed
9 Commercial Building (Vijayawada) Repair & Rehabilitation of RCC Structure Completed
10 Historical Building-Temple (Pedapadu-Eluru) Waterproofing and Protective Coating System Completed
11 M/S Pennar Industries Ltd (Vealchal) PU Grouting for Zinc Pit Completed
12 M/S Pennar Industries Ltd (Isnapur) Strengthening of Metallurgical Lab Completed
13 M/S KMC Constructions Limited (Kurnool) Rebar Anchoring for Minor Bridges at Nh-40 (New) Completed
14 M/S GAR Corporation Pvt Ltd

(SEZ Project)

Strengthening of Columns and Footings Completed
15 M/S GAR Corporation Pvt Ltd (SEZ Project) Strengthening of Canopy Columns Completed
16 M/S Laxmi Infobahn Pvt Ltd

(GAR Projects)

Strengthening of Canopy Columns Completed
17 M/S Novotel (Hitech City) Waterproofing and Protective Coating System Completed
18 M/S GAR Corporation Pvt Ltd

(SEZ Project)

Strengthening of Columns at Tower-1 Completed
19 M/S Pennar Industries Ltd (Isnapur) Repair & Rehabilitation of RCC Structure Completed
20 M/S Reliance India Ltd Poly Urea Terrace Waterproofing Completed
21 M/S Laxmi Infobahn Pvt Ltd
(GAR Projects)
Strengthening of Footings and Columns at Tower-2 Completed
22 M/S Laxmi Infobahn Pvt Ltd

(GAR Projects)

Strengthening of Footings and Columns at Tower-1 Completed
23 M/S Laxmi Infobahn Pvt Ltd

(GAR Projects)

Strengthening of Columns with Steel Plate Tower -1 Completed
24 M/S Laxmi Infobahn Pvt Ltd

(GAR Projects)

Strengthening of Footings at Tower- 4 Completed
25 M/S Pennar Industries Ltd (Vealchal) PU Grouting for RO Tanks Completed
26 M/S Pennar Industries Ltd (Vealchal) PU Grouting for RO Tanks Completed
27 M/S Laxmi Infobahn Pvt Ltd

(GAR Projects)

Rebar Anchoring at Tower – 5 Completed
28 M/S Pennar Industries Ltd (Isnapur) PU Grouting Completed
29 M/S Laxmi Infobahn Pvt Ltd

(GAR Projects)

Strengthening of Columns with Steel Plate at Tower – 2 Completed
30 M/S GAR Corporation Pvt Ltd

(SEZ Project)

Canopy Drilling & Grouting at Tower – 3 Completed
31 M/S South Central Railway (Vijayawada) Pier Strengthening Completed
32 Vijayawada Municipal Corporation Strengthening of columns with CFRP system and Concrete Jacketing Completed
33 M/S Laxmi Infobahn Pvt Ltd

(GAR Projects)

Strengthening of Shear Wall at Tower – 5 Completed
34 M/S Dr Reddy’s Laboratories Ltd (Hyderabad) Strengthening of Beams by CFRP System at TG Area. Completed
35 M/S GAR Corporation Pvt Ltd

(SEZ Project)

 Drilling of Holes to Fix the TMT Steel Bars @89 Site Completed
36 M/S Dr Reddy’s Laboratories Ltd (Hyderabad) PMM Treatment for Slabs @ TD Area. Completed
37 M/S Laxmi Infobahn Pvt Ltd

(GAR Projects)

Supply & Fixing Of 16 mm Dia Hilti HSL 3g 16/25*153 mm Length Anchor Bolts. Completed
38 M/S Dr Reddy’s Laboratories Ltd (Hyderabad) PMM Treatment for Slabs at QC Area. Completed
39 Mr. Purna Karnam-Commercial Building (Vijayawada) Strengthening of columns with Micro concreting. Completed
40 M/S GAR Corporation Pvt Ltd

(SEZ Project)

Strengthening of columns at Tower -3. Completed
41 Vijayawada Municipal Corporation Strengthening of columns with Micro Concrete. Completed
42 M/S Laxmi Infobahn Pvt Ltd

(GAR Projects)

Shuttering & Fabrication Work at Tower-1 Completed
43 M/S Sree Chakra Constructions (Nacharam) Retrofitting works for ESI Building–ESIC Hospital Project. Completed
44 M/S Laxmi Infobahn Pvt Ltd

(GAR Projects)

Strengthening of Lift Cut-outs with Micro concrete. Completed
45 M/S Dr Reddy’s Laboratories Ltd (Hyderabad) Strengthening of Utility Building At FTO-3. Completed
46 M/S Laxmi Infobahn Pvt Ltd

(GAR Projects)

Strengthening of Columns with Micro Concreting @ Tower 5. Completed
47 M/S Ashoka Buildcon (Visakhapatnam) Non-Destructive Testing of Existing Structures @ NH-16 Completed
48 Bharat Sanchar Nigam Limited (Hyderabad) Localised Treatment to Distressed RCC Slab &Beams at Charminar, Hyderabad. Completed
49 M/S Samarth Infraengg Technocrats Pvt Ltd Condition Assessment and Inventory of Existing Structures Completed
50 M/S GAR Corporation Pvt Ltd

(SEZ Project)

Strengthening of Columns with Steel Plate at Tower- 89 Site Completed
51 M/S Laxmi Infobahn Pvt Ltd
(GAR Projects)
Strengthening of Slab with Micro Concrete & Steel Plate at Tower-5 Completed
52 M/S JMC Projects (Hyderabad) Core Wall Grouting Completed
53 M/S Laxmi Infobahn Pvt Ltd (GAR Projects) Various Types of Drilling and Fixing Rebar’s with Hilti Re-500 Chemical at Tower – 5& Tower – 6 Completed
54 M/S Ashoka Buildcon (Visakhapatnam) Gp2 Grouting For New Bridge Girders @ NH-16 Completed
55 M/S Sree Aditya Landscaping India Pvt Ltd Column Strengthening works at Chennupati Ramakotaiah Indoor Stadium, Vijayawada Completed
56 M/S Samarth Infraengg Technocrats Pvt Ltd Condition Assessment and Inventory of Existing Structures at Aurangabad- Jalna And Dhule – Palesner Sections. Completed
57 M/S Laxmi Infobahn Pvt Ltd
(GAR Projects)
Strengthening of Lift Cut-outs with Micro Concrete At 10th Floor Completed
58 M/S GAR Corporation Pvt Ltd

(Sez Project)

Strengthening of Slab Core Wall with Steel Plate at Tower – 89 Completed
59 M/S Laxmi Infobahn Pvt Ltd
(GAR Projects)
STP Retrofitting at Tower-5 Completed
60 M/S Ashoka Buildcon NDT Testing At NH-16 For New Structures in The State of Andhra Pradesh Completed
61 M/S Laxmi Infobahn Pvt Ltd
(GAR Projects)
Strengthening of Lift Pits Slabs and Walls at Basement -3&4 Levels Completed
62 M/S GAR Corporation Pvt Ltd

(Sez Project)

Strengthening of Core Wall & C-4 Column with Steel Plate at Tower – 89 Completed
63 M/S SPL Infrastructure Pvt Ltd ND Testing for Existing Structures At NH-6 in the State of Andhra Pradesh Completed
64 Dasami Lab Pvt Ltd, Chityala Cutting of Slabs Completed
65 M/S Laxmi Infobahn Pvt Ltd
(GAR Projects)
Various Types of Drilling and Fixing Rebar’s with Hilti Re-500 Chemical at Tower – 5 & 6 Completed
66 M/S Laxmi Infobahn Pvt Ltd

(GAR Projects)

Strengthening of Columns with Steel Plate @ Tower 5. Completed
67 M/S SPL Infrastructure Pvt Ltd Rehabilitation of Major Bridge at Km-52+656 of Six Laning Of Chennai-Tada Section NH-16. Completed
68 M/S Zuari Cements, Sitapuram Private Limited Strengthening of Generator front bearing sole plate Completed
69 M/S Hetero Labs Limited

Visakhapatnam

Retrofitting of existing slabs and beams by CFRP & Concrete Jacketing System for PB and SB Buildings Completed
70 M/S BVSR Constructions Pvt Ltd. Rehabilitation and Upgradation of Giddalur-Vinukonda Section of NH-544D in the state of Andhra Pradesh. Completed
71 M/S Honour Lab Limited -Unit-V Retrofitting of existing slabs,columns and beams by CFRP System for SB Completed
72 M/S Honour Lab Limited -Unit-V Carrying out ND Testing for various structures at Honour Lab Limited. Completed
73 M/S Legend Chimes, Hyderabad. Strengthening of beams with micro concrete and CFRP Completed
74 M/S BSR Builders LLP Column Strengthening for Proposed IT Building BSR Tech Park. Completed
75 Vasavi Projects, Bangalore  Strengthening of columns with micro concrete and CFRP  completed
76 M/S BVSR Constructions Pvt Ltd. Non-Destructive and Destructive Testing for retained/retained and widening Bridges of Giddalur-Vinukonda Section of NH-544D in the state of Andhra Pradesh.. Completed
77 M/S Nalanda Vidya Niketan, Vijayawada Strengthening of existing building with micro concrete and CFRP Completed
78 M/S NSL SEZ Pvt Ltd.

Uppal, Hyderabad

Strengthening of columns with micro concrete Completed
79 BSCPL Infrastructure Limited, Bapatla Strengthening of Girders Completed
80 Aditya Hospital, Abids, Hyderabad Localised Treatment for Existing Structure
Nalanda: Strengthening of existing structure with concrete Jacketing and CFRP system
Completed
81 M/S BVSR Constructions Pvt Ltd. Aditya Hospital, Abids, Hyderabad Polyurethane (PU) Grouting in Toll Plaza Tunnels of Giddalur-Vinukonda Section of NH-544D in the state of Andhra Pradesh. Completed
82 Aspiro Pharma Limited, R & D Block, Karkapatla Strengthening of Terrace Slab  Completed
83 M/S BVSR Constructions Pvt Ltd.  Rehabilitation and Upgradation of Giddalur-Vinukonda Section of NH-544D in the state of Andhra Pradesh. Completed
84 Mr. K Rajendra Prasad, Residential Building, Hyderabad Strengthening of Residential Building Completed
85  Phoenix Tech Zone Pvt Ltd, Hyderabad Strengthening of Slab with CFRP Laminates Completed
86 M/S Vijayawada Toll way Private Limited Repair of Expansion Joints on Kanaka Durgamma Varadhi On LHS in Connection With 6 Laning of Chilakaluripet-Vijayawada Section Of NH 16. On Going
87 M/S BSR Builders LLP, BSR Tech Park, Block-2, Hyderabad Column and Footing Strengthening for Proposed IT Building BSR Tech Park. On Going
88 Genious Constructions, Raidurgam. Column Strengthening and Slab Cutting Works On Going
89 M/S BSR Builders LLP, BSR Tech Park, Block-2, Hyderabad. Slab Extension works for Proposed IT Building BSR Tech Park. On Going
90 Koduru Enclave,Vijayawada. Strengthening of beams and Columns On Going
91 Godhra Expressways Private Limited,Dahod,Gujarat. Specialized Repair Works for Bridges at Godhra -MP/Gujarat Border Section of NH-59. On Going
92 M/S Laxmi Infobahn Software Technology Park LLP(GAR Projects) Strengthening of Columns and Slabs with Steel Plate @ Tower 5 & 6 On Going